Jenik

Champlain Bridge Project

Champlain Bridge Project

For many years, our team assisted contractors and the DOT with bridge maintenance. Our interventions are very versatile, ranging from inspection to the installation of permanent gateways for repair work. The work on this particular bridge is carried out with different machinery adapted exclusively for this project. This is why many of our units, all different from one another, are regularly requested for this project, particularly J-140/45H, J-160/53M, J-170/55M, J-190/60B and others.

Share

Contact Us

Feel free to contact us to learn more about our products, services, production and training methods, or for any other inquiries.

Form

    Prefer to contact us in a different way?

    Contact us : [email protected]
    Call us : +1 450 446-4531
    Toll free : +1 800 889-4573