This project consisted in setting up a pipeline used to unload oil from tankers at Irving’s oil refinery, in St-John, New-Brunswick. In view of the task’s complexity, our intervention was made possible with the help of two units, namely J-120/39H and J-140/45H. These tasks were carried out over a period of three and a half months, from March to June 2014. The pipeline was installed over a distance of one kilometer. Our machinery’s advanced mobility system was extremely useful for this project.