Jenik

Irving Project

Irving Project

This project consisted in setting up a pipeline used to unload oil from tankers at Irving’s oil refinery, in St-John, New-Brunswick. In view of the task’s complexity, our intervention was made possible with the help of two units, namely J-120/39H and J-140/45H. These tasks were carried out over a period of three and a half months, from March to June 2014. The pipeline was installed over a distance of one kilometer. Our machinery’s advanced mobility system was extremely useful for this project.

Share

Contact Us

Feel free to contact us to learn more about our products, services, production and training methods, or for any other inquiries.

Form

    Prefer to contact us in a different way?

    Contact us : [email protected]
    Call us : +1 450 446-4531
    Toll free : +1 800 889-4573